Calling all Contractors!
The Mid Sound Fisheries Enhancement Group(MSFEG), Seattle, WA is requesting bids for a Family Forest Fish Passage Project (FFFPP) culvert replacement project located near Gorst in Kitsap County Washington. The project includes dewatering, removal of an existing concrete pipe culvert and construction of a new fish passable structural steel plate culvert and steel retaining walls. Bid documents, including plans and specifications, permits and draft contracts will be available here (links below) by the afternoon of March 9, 2018.
The Engineer’s estimate for the cost of the project is $150,000. MSFEG will accept proposals by email or sealed bids submittal. A mandatory Pre-bid meeting will take place at 11am March 19th. Bids are due March 27, 2018 at 3pm. See bid instructions for details. A Bid and a Contract Bond are required. All work shall be conducted in accordance with Washington State’s Prevailing Wage Law. For questions please email jay@chinook-engineering.com and call Jay Kidder at Chinook Engineering, 360.672.5528, or MSFEG at info@midsoundfisheries.org and 206.529.9467.
FFFPP 14-1231 Vedin Crossing Kabelac Creek Specifications and Bid Doc 03082018